Step | | Procedure & Parts & Tools |
1 |
|
TURN MACHINE OFF
|
2 |
|
LOCATE THE CHARGER PLUG ON THE BACK OF THE MACHINE AND PULL TO DISCONNECT IT.
|
3 |
|
LOCATE THE DRAIN HOSES ON THE BACK OF THE MACHINE
|
4 |
|
PULL TO REMOVE THE BLUE CAPPED HOSE FROM MACHINE. PLACE HOSE NEAR DRAIN AND REMOVE CAP
|
5 |
|
PULL TO REMOVE THE RED CAPPED HOSE FROM MACHINE. PLACE HOSE NEAR DRAIN AND REMOVE CAP
|
6 |
|
REMOVE THE 2 TANK BOLTS ON EACH SIDE OF THE MACHINE. THESE BOLTS ARE LOCATED AT THE FRONT OF THE MACHINE AT THE BASE.
Wrench-Allen metric 6.0mm |
|
|
7 |
|
LIFT THE TANK TO OPEN THE MACHINE
|
8 |
|
REMOVE THE 2 SCREWS HOLDING THE CONTROL BOARD COVER
Torx T20 |
|
|
9 |
|
PULL UP ON THE CONTROL BOARD COVER TO REMOVE IT FROM THE MACHINE
|
10 |
|
LOCATE THE END OF THE COMMUNICATION CABLE THATS ATTACHED TO THE POWER BOARD. LOOSEN THE SCREW BY HAND AND PULL CABLE TO REMOVE IT FROM THE POWER BOARD.
|
11 |
|
PULL BOTH CONNECTOR BLOCKS TO REMOVE THEM FROM THE POWER BOARD. HALF OF EACH BLOCK WILL REMAIN ON THE BOARD. THE NEW BOARD INCLUDES THE ATTACHED BLOCKS.
|
12 |
|
REMOVE THE SCREW HOLDING THE BATTERY CABLE ENDS AND THE GROUND WIRE.
Wrench-Allen metric 4.0mm |
|
|
13 |
|
GENTLY SLIDE THE POWER BOARD OUT OF THE HOLDER.
|
14 |
|
REVERSE STEPS 6 THRU 13 TO INSTALL A NEW POWER BOARD. 192-5637 (POWER MODEL) AND 192-1491 (ECO MODEL). RECONNECT THE CHARGER PLUG.
|